Contractor: Leighs
Passive Fire NZ were proud to partner with Leighs Construction in the major redevelopment of the Allevia Hospital’s (formerly MercyAscot) theatre wing. This project involved opening a cutting-edge new theatre block in late 2024 featuring 10 modern operating theatres, a 17-bed Post Anaesthetic Care Unit, 6 ICU beds, 6 HDU beds and a 24-room ward (20 single, 4 double bedrooms). This cutting edge facility with care at its core, required world-class passive fire protection to safeguard patient and staff safety.
Passive Fire NZ played a critical role in ensuring fire safety standards were compliant and reliable, installing fire-stopping systems that matched the hospital’s premium standards. Careful demolition, foundation work and vibration-minimisation measures were being carried out throughout the project, which required meticulous planning for onsite operation and safety. The brand new, modern, first-class healthcare institute provides additional capacity for specialists which enables better and faster patient treatment, in exceptional constructed, reliable and highly certified buildings.
If you’ve worked with us on Allevia Theatres or another project, we welcome your feedback.

From evaluation to implementation, we work with you to eliminate your risk.