Contractor: Dominion Construction
Converting a 22-level office building into a fully operational hotel is no easy feat, especially when the hotel goes live before construction is even complete. At Four Points Sheraton, constructed by Dominion Constructors, Passive Fire NZ tackled the challenge head-on, designing an innovative central penetration system that allowed multiple services to pass through fire-rated walls at a single location. This streamlined installation reduced costs and ensured compliance across all penetrations. Extensive pre-planning also made gib installation easier, eliminating the need to cut around thousands of penetrations which kept the project running smoothly.
Working within a live hotel environment required adaptability and professionalism. With guests already checked in, our team adjusted workflows to minimise disruption. Even carrying materials 20 stories by hand to avoid noise impact. We also worked closely with other trades, not just handling fire compliance but helping sequence construction for maximum efficiency. This project is a testament to how Passive Fire NZ operates: smart solutions, seamless execution, and a commitment to quality that goes beyond compliance.
If you’ve worked with us on Four Points Sheraton Hotel or another project, we welcome your feedback.

From evaluation to implementation, we work with you to eliminate your risk.